As we previously wrote, in December 2019, Ontario’s Minister of the Environment, Conservation and Parks granted an appeal overturning the Environmental Review Tribunal’s (ERT) approval of the Nation Rise Wind Farm in North Stormont, Ontario. The main basis for the decision was the Minister’s finding that the project will result in localized harm to bats and this should be considered to be serious and irreversible harm to animal life because of the relatively small bat species population in the local area. The decision was notable because the 100MW wind project had been under construction since May 2019.

In a decision issued on May 14, 2020, Ontario’s Divisional Court granted the project proponent’s judicial review application and quashed the Minister’s decision and restored the project approval.

The Divisional Court reached its decision on two bases. First, the Court found that the Minister’s determination was not reasonable. In reaching that conclusion, the Court noted that the Minister had added issues (including the bat issue) not considered by the ERT and this was not permitted by legislation. The Court further found that the Minister applied the wrong legal test and made factual conclusions not supported by the record. Second, the Court found that the Minister had breached his duty of procedural fairness by failing to provide the developer with the opportunity to be heard on important matters, including remedy.

Taking into account the issues identified in the Minister’s decision, the Court decided to reinstate the ERT’s approval, rather than sending the matter back to the Minister for redetermination. This means that the project approval stands unless the Minister successfully appeals to the Ontario Court of Appeal.

Areas of Expertise

Related Blogs

Posted in: Facilities | Ontario | Climate Change / Renewables | Energy Policy

Insights EnergyInsider
Ontario Minister of the Environment Revokes Approval of Under-Construction Wind Farm Project By David Stevens Dec 12, 2019 On December 4, Ontario’s Minister of the Environment, Conservation and Parks granted an appeal overturning the approval of the Nation Rise Wind Farm in North Stormont, Ontario.

Posted in: Energy Policy | Climate Change / Renewables | Ontario

Insights EnergyInsider
Ontario Releases Its New Environment Plan By David Stevens Dec 06, 2018 On November 29, 2018, the Ontario government released its promised plan to address climate change, titled Preserving and Protecting our Environment for Future Generations: A Made-in-Ontario Environment Plan. The Environment Plan addresses four main topics: protecting air and water; addressing cli...

Posted in: Canada (Federal) | British Columbia

Insights EnergyInsider
Supreme Court of British Columbia Dismisses Challenges to Trans Mountain Pipeline Environmental Assessment By Stan Fedun Jun 05, 2018 On May 24, 2018, the Supreme Court of British Columbia dismissed challenges to the Trans Mountain Pipeline Expansion Project by the City of Vancouver and the Squamish Nation.​ Both parties petitioned the Court to set aside the Environmental Assessment...

Posted in: Ontario | Climate Change / Renewables

Insights EnergyInsider
Environmental Commission of Ontario reports that LTEP Ignores Climate Law Apr 23, 2018 The Ontario government’s 2017 Long-Term Energy Plan (LTEP) is not consistent with its obligations under climate change mitigation law, according to a progress report issued by the Environmental Commission of Ontario (ECO) on April 9, 2018.